textmachine/platform/docs
2026-08-16 02:41:06 +03:00
..
archive Land platform P6 and its dofix: consumer half of the event seam, form-B intake, dev stand seed, engine upgrade order, register through PD-245 2026-08-15 04:45:23 +03:00
DEFECT_REGISTER.md Land platform P6 and its dofix: consumer half of the event seam, form-B intake, dev stand seed, engine upgrade order, register through PD-245 2026-08-15 04:45:23 +03:00
ENGINEERING_STANDARDS.md Land platform P5 after three acceptance rounds: streaming book intake with storage sentinel, stop and resume with recorded intent, Prometheus observability, enforced Go 1.26.6 floor 2026-08-14 02:24:08 +03:00
platform-PROGRESS.md Ping the platform zone: contract review accepted, PD-104 closed by owner word, the platform half of batch 0.3.0 and passing findings listed 2026-08-16 02:41:06 +03:00
PLATFORM_DIRECTION.md Land platform P6 and its dofix: consumer half of the event seam, form-B intake, dev stand seed, engine upgrade order, register through PD-245 2026-08-15 04:45:23 +03:00
STACK_DECISIONS.md Land platform P6 and its dofix: consumer half of the event seam, form-B intake, dev stand seed, engine upgrade order, register through PD-245 2026-08-15 04:45:23 +03:00