| .. |
|
control_test.go
|
Land platform P5 after three acceptance rounds: streaming book intake with storage sentinel, stop and resume with recorded intent, Prometheus observability, enforced Go 1.26.6 floor
|
2026-08-14 02:24:08 +03:00 |
|
intake_test.go
|
Land platform P5 after three acceptance rounds: streaming book intake with storage sentinel, stop and resume with recorded intent, Prometheus observability, enforced Go 1.26.6 floor
|
2026-08-14 02:24:08 +03:00 |
|
middleware.go
|
Accept and land platform P1 and P2 after adversarial acceptance with own mutations and live probes, ratifying six decisions and filing twenty-nine defect rows to PD-107
|
2026-08-07 02:51:28 +03:00 |
|
problem.go
|
Land platform P0 skeleton: module, HTTP surface with security headers, server-side sessions with CSRF, read-model migrations, NDJSON ingest interface, zone battery and stack pins
|
2026-08-04 23:55:30 +03:00 |
|
serve.go
|
Accept and land platform P1 and P2 after adversarial acceptance with own mutations and live probes, ratifying six decisions and filing twenty-nine defect rows to PD-107
|
2026-08-07 02:51:28 +03:00 |
|
serve_test.go
|
Accept and land platform P1 and P2 after adversarial acceptance with own mutations and live probes, ratifying six decisions and filing twenty-nine defect rows to PD-107
|
2026-08-07 02:51:28 +03:00 |
|
server.go
|
Land platform P5 after three acceptance rounds: streaming book intake with storage sentinel, stop and resume with recorded intent, Prometheus observability, enforced Go 1.26.6 floor
|
2026-08-14 02:24:08 +03:00 |
|
server_test.go
|
Accept and land the platform fix pack: nine register rows closed, eight of my own mutations caught by name, the sign-in denial and the sandbox measurements reproduced
|
2026-08-08 01:12:17 +03:00 |
|
v0.go
|
Land platform P6 and its dofix: consumer half of the event seam, form-B intake, dev stand seed, engine upgrade order, register through PD-245
|
2026-08-15 04:45:23 +03:00 |
|
v0_test.go
|
Land platform P6 and its dofix: consumer half of the event seam, form-B intake, dev stand seed, engine upgrade order, register through PD-245
|
2026-08-15 04:45:23 +03:00 |