e64d921e48
|
Raise the ja ceiling after the guard fired on a conservative projection, with the measured cell price recorded
|
2026-08-14 18:07:37 +03:00 |
|
|
|
1f66b354fe
|
Freeze the ja reconnaissance axis and its raised ceiling: shared base purchasing, pair-scoped tags and the descriptive status asserted by selftest
|
2026-08-14 17:36:28 +03:00 |
|
|
|
9c8a6c0b06
|
Raise the en axis ceiling to the owner-sanctioned amount and the pack ceiling by the same delta so the phase-sum invariant holds
|
2026-08-14 17:32:49 +03:00 |
|
|
|
2fed3d060f
|
Raise the pack ceiling to 6.15 on the owner's sanction, funding the A1B re-buy that a session defect made necessary
|
2026-08-11 11:30:03 +03:00 |
|
|
|
6faa52f753
|
Raise the D4 sub-ceiling by two cents on the owner's sanction so the last A1B cell completes; the package ceiling is untouched
|
2026-08-11 11:14:46 +03:00 |
|
|
|
cf85678e2a
|
Freeze phase D judging design and $6.00 ceiling: two zero-cost judge families with a pre-registered disagreement rule, external judge isolated, Д7 cap restored to the order's $0.05
|
2026-08-11 03:42:45 +03:00 |
|
|
|
8950352fa2
|
Freeze phase D pre-reg erratum and harness repair: A2 arm built, battery wired with violation whitelist, per-contrast power with Student quantile, guard is a real stop
|
2026-08-11 03:18:37 +03:00 |
|
Claude (backend session)
|
da5f4d0224
|
Freeze phase D pre-registration: hypotheses verbatim, Holm-corrected power with declared families, equivalence margin, measured budget, cash desk, ja pair pack
|