Claude (backend session)
|
80aafdeb99
|
Fix the pair-path leak that sent Chinese editor rules to English one-pass cells, declare each arm reasoning level explicitly, and record the review errata
|
2026-08-22 00:12:32 +03:00 |
|
Claude (backend session)
|
22a8a6b70f
|
Freeze the buying code for the Japanese leg noise floor: a second editor generation instead of the near-deterministic fixer floor
|
2026-08-15 20:30:05 +03:00 |
|
Claude (backend session)
|
8c68828303
|
Freeze the buying code for the Japanese leg of H-4: second editor arm, its own cash phase and measured guard expectation
|
2026-08-15 19:49:38 +03:00 |
|
|
|
7d0f133247
|
Let the floor fall back to deterministic places when an axis has no semantic critic so the reconnaissance axis gets a threshold instead of silently buying nothing
|
2026-08-14 21:08:25 +03:00 |
|
|
|
548d1ce6dd
|
Make the output budget an axis parameter and gate cell validity so truncated empty cells are quarantined and rebought instead of judged as arms
|
2026-08-14 18:28:25 +03:00 |
|
|
|
969ad2f8dc
|
Make the noise floor and judge audit belong to the axis so the en panel gets its own threshold and cannot read any axis raw cells
|
2026-08-14 17:37:53 +03:00 |
|
|
|
1f66b354fe
|
Freeze the ja reconnaissance axis and its raised ceiling: shared base purchasing, pair-scoped tags and the descriptive status asserted by selftest
|
2026-08-14 17:36:28 +03:00 |
|
|
|
5000f2c88a
|
Freeze the en axis driver before its purchases: pre-registered E-arm names mapped to shared contour kinds, phase-scoped tags and fresh bases on the reworked pair prompts
|
2026-08-14 16:27:17 +03:00 |
|
|
|
9df7944381
|
Freeze the phase-D harness before the en-axis purchases: pair provider, wired rig hooks, pinned unit manifests, pair terminologist prompts and the paid contamination path
|
2026-08-14 14:17:42 +03:00 |
|
|
|
2fed3d060f
|
Raise the pack ceiling to 6.15 on the owner's sanction, funding the A1B re-buy that a session defect made necessary
|
2026-08-11 11:30:03 +03:00 |
|
|
|
415f54f098
|
Add arm A1B carrying the ordered flag contour with the battery wired, keeping the paid canon-only A1 cells intact as a descriptive arm
|
2026-08-11 03:57:59 +03:00 |
|
|
|
8950352fa2
|
Freeze phase D pre-reg erratum and harness repair: A2 arm built, battery wired with violation whitelist, per-contrast power with Student quantile, guard is a real stop
|
2026-08-11 03:18:37 +03:00 |
|
Claude (backend session)
|
4f698106e9
|
Fix silent cross-pack cash misroute: buy is a singleton and the last configurer won, so paid cells landed in another pack directory while the phase ledger read zero
|
2026-08-10 17:11:22 +03:00 |
|
Claude (backend session)
|
488d1d0b8d
|
Freeze phase D edit-contour harness: fixer sees only flagged places, bank law on every arm including the critic, isolation selftest
|
2026-08-10 12:19:31 +03:00 |
|