Commit graph

11 commits

Author SHA1 Message Date
8be5653862 Wire the phase 2b arms into the same judging rig so their contrasts stay comparable with phase 2a 2026-08-08 00:53:16 +03:00
caaf36d24f Restore the polygon scripts lost to the 08.08 checkout incident and land the phase 2b arms module: exact-number gate matching, degrees-of-freedom correction, counting drift metric, point-repair arms C and E 2026-08-08 00:39:31 +03:00
399147aa76 Fix the drift plan price table and purchase loop to include the deconfound arm 2026-08-07 21:06:19 +03:00
059c681c9e Amend the drift freeze before reading its numbers: add the same editor with the term bank, because the first arm set confounded topology with bank presence 2026-08-07 21:06:09 +03:00
3bc01c6d69 Freeze the drift rig before paid calls: contiguous ten-chapter run, arms and ceiling declared, ledger glob covering its own tag, plus the guarded and QE routing modules that closed the routing branch 2026-08-07 20:36:02 +03:00
6d79dfbd83 Freeze the absolute judging rig before the second pass: family pinned into the key, salt out of the repo, per-axis justification, floor verdict, position control, judge identity, ledger covering the arm tags it pays 2026-08-07 16:52:21 +03:00
0eefc97df8 Freeze the fourth-edition agent judging rig before judging: opaque packet names, randomised layout, mandatory quoted justification, embedded decoy floor and twin controls 2026-08-07 15:01:58 +03:00
ae311e7470 Land the third-edition tier scripts into the repository so paid runs reproduce from the tree, with rig floor, judge variance and own-draft arms 2026-08-07 13:49:42 +03:00
769a2c8451 Freeze the third-edition role-topology pre-registration before paid calls: declared contrast family, computed power, re-declared ceilings, purchase order 2026-08-07 10:51:30 +03:00
d4725999f2 Freeze the second-edition role-topology harness before paid calls: mirrored judging, arms matching the prompt letter, shared purchase ledger, repaired battery 2026-08-07 02:13:17 +03:00
864038a414 Freeze experiment 21 pre-registration and the role-topology harness before any paid call, with detector, battery and verifier results measured at zero cost 2026-08-06 18:40:37 +03:00