Commit graph

10 commits

Author SHA1 Message Date
548d1ce6dd Make the output budget an axis parameter and gate cell validity so truncated empty cells are quarantined and rebought instead of judged as arms 2026-08-14 18:28:25 +03:00
969ad2f8dc Make the noise floor and judge audit belong to the axis so the en panel gets its own threshold and cannot read any axis raw cells 2026-08-14 17:37:53 +03:00
1f66b354fe Freeze the ja reconnaissance axis and its raised ceiling: shared base purchasing, pair-scoped tags and the descriptive status asserted by selftest 2026-08-14 17:36:28 +03:00
5000f2c88a Freeze the en axis driver before its purchases: pre-registered E-arm names mapped to shared contour kinds, phase-scoped tags and fresh bases on the reworked pair prompts 2026-08-14 16:27:17 +03:00
9df7944381 Freeze the phase-D harness before the en-axis purchases: pair provider, wired rig hooks, pinned unit manifests, pair terminologist prompts and the paid contamination path 2026-08-14 14:17:42 +03:00
2fed3d060f Raise the pack ceiling to 6.15 on the owner's sanction, funding the A1B re-buy that a session defect made necessary 2026-08-11 11:30:03 +03:00
415f54f098 Add arm A1B carrying the ordered flag contour with the battery wired, keeping the paid canon-only A1 cells intact as a descriptive arm 2026-08-11 03:57:59 +03:00
8950352fa2 Freeze phase D pre-reg erratum and harness repair: A2 arm built, battery wired with violation whitelist, per-contrast power with Student quantile, guard is a real stop 2026-08-11 03:18:37 +03:00
Claude (backend session)
4f698106e9 Fix silent cross-pack cash misroute: buy is a singleton and the last configurer won, so paid cells landed in another pack directory while the phase ledger read zero 2026-08-10 17:11:22 +03:00
Claude (backend session)
488d1d0b8d Freeze phase D edit-contour harness: fixer sees only flagged places, bank law on every arm including the critic, isolation selftest 2026-08-10 12:19:31 +03:00