Commit graph

21 commits

Author SHA1 Message Date
Claude (backend session)
af0447aa6b Move the unused stopped-phase budget into the English role-prompt phase without touching the pack ceiling 2026-08-22 00:23:16 +03:00
Claude (backend session)
88a79a06f0 Add gates that prove each review fix behaves, surface the multi-instance pair mine, and raise the English role-prompt ceiling for the sanctioned purchases 2026-08-22 00:21:29 +03:00
Claude (backend session)
7f15323a8d Freeze the role-built one-pass prompt, its buying code and the sanctioned ceilings before the first cell 2026-08-20 15:39:46 +03:00
Claude (backend session)
650b4fea12 Freeze the buying code and owner-sanctioned ceilings for the critic-input presentation measurement 2026-08-20 13:57:08 +03:00
Claude (backend session)
6d0759d331 Buy the last two Chinese floor cells the sanctioned five did not cover due to a low per-cell estimate 2026-08-17 02:01:00 +03:00
Claude (backend session)
5d6b3a6489 Raise both ceilings by the owner's word to buy the last five noise-floor cells 2026-08-17 01:53:40 +03:00
Claude (backend session)
e727881bdc Raise the two run ceilings to cover the remaining 24 cells after the balance top-up 2026-08-17 00:51:26 +03:00
Claude (backend session)
3ca4936212 Raise the run ceilings to the re-priced estimate and trim closed phases to actuals 2026-08-16 22:27:32 +03:00
Claude (backend session)
0961a10d5d Freeze the buying code and ceilings for the D17 run before the DeepSeek price cutover 2026-08-16 03:00:10 +03:00
Claude (backend session)
22a8a6b70f Freeze the buying code for the Japanese leg noise floor: a second editor generation instead of the near-deterministic fixer floor 2026-08-15 20:30:05 +03:00
Claude (backend session)
8c68828303 Freeze the buying code for the Japanese leg of H-4: second editor arm, its own cash phase and measured guard expectation 2026-08-15 19:49:38 +03:00
629458a60d Freeze the ceiling before rebuying the identical Japanese floor halves that understate the axis threshold 2026-08-15 05:19:58 +03:00
4ff45c54ce Freeze the ceilings before the sanctioned E3 critic rebuy and bring the ja ceiling into git, where spending had already exceeded the committed bound 2026-08-15 03:39:49 +03:00
e64d921e48 Raise the ja ceiling after the guard fired on a conservative projection, with the measured cell price recorded 2026-08-14 18:07:37 +03:00
1f66b354fe Freeze the ja reconnaissance axis and its raised ceiling: shared base purchasing, pair-scoped tags and the descriptive status asserted by selftest 2026-08-14 17:36:28 +03:00
9c8a6c0b06 Raise the en axis ceiling to the owner-sanctioned amount and the pack ceiling by the same delta so the phase-sum invariant holds 2026-08-14 17:32:49 +03:00
2fed3d060f Raise the pack ceiling to 6.15 on the owner's sanction, funding the A1B re-buy that a session defect made necessary 2026-08-11 11:30:03 +03:00
6faa52f753 Raise the D4 sub-ceiling by two cents on the owner's sanction so the last A1B cell completes; the package ceiling is untouched 2026-08-11 11:14:46 +03:00
cf85678e2a Freeze phase D judging design and $6.00 ceiling: two zero-cost judge families with a pre-registered disagreement rule, external judge isolated, Д7 cap restored to the order's $0.05 2026-08-11 03:42:45 +03:00
8950352fa2 Freeze phase D pre-reg erratum and harness repair: A2 arm built, battery wired with violation whitelist, per-contrast power with Student quantile, guard is a real stop 2026-08-11 03:18:37 +03:00
Claude (backend session)
da5f4d0224 Freeze phase D pre-registration: hypotheses verbatim, Holm-corrected power with declared families, equivalence margin, measured budget, cash desk, ja pair pack 2026-08-10 07:06:07 +03:00